← 4318 Clybourne Ave, Cleveland, OH 44109 · Portfolio index

Repair Invoice - 2022-04-28 - 4318 Clybourne Ave Cleveland, OH 44109.pdf

Generated 2026-07-01T05:25:50.520233+00:00 from live Dropbox Public folders.

Property4318 Clybourne Ave, Cleveland, OH 44109
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Repair Invoice - 2022-04-28 - 4318 Clybourne Ave Cleveland, OH 44109.pdf
Source path/mnt/c/Users/digit/Dropbox/Real Estate/OH/4318 Clybourne Ave, Cleveland, OH 44109/Public/08 - Repairs & Maintenance/Repair Invoice - 2022-04-28 - 4318 Clybourne Ave Cleveland, OH 44109.pdf
Modified UTC2022-06-30T12:56:49.0000000Z
Size bytes321268
Extraction methodmetadata-only+pdftotext-incremental

Description

ESTIMATE DUFFY’S ELECTRIC PO BOX 19203 CLEVELAND OHIO 44119 Licensed & Insured 04-08-2022 JOB ADDRESS: 4318 Clybourne DN Cleveland wilkins 2.538.6980 WORK ORDER #65965 SCOPE: refeed (3) refeed sw/light/circuit, refeed (3) receps (dining room and bedroom) 1 1 labor materials $ $ 1,890.00 350.00 ESTIMATED JOB COST PERMIT TOTAL JOB COST $ $ $ 2,240.00 100.00 2,340.00 Scope of Work: The contractor will need to refeed each switch, light and receptacle that is not working. Refeeding entails fishing wi

Extracted Content

ESTIMATE DUFFY’S ELECTRIC PO BOX 19203 CLEVELAND OHIO 44119 Licensed & Insured 04-08-2022 JOB ADDRESS: 4318 Clybourne DN Cleveland wilkins 2.538.6980 WORK ORDER #65965 SCOPE: refeed (3) refeed sw/light/circuit, refeed (3) receps (dining room and bedroom) 1 1 labor materials $ $ 1,890.00 350.00 ESTIMATED JOB COST PERMIT TOTAL JOB COST $ $ $ 2,240.00 100.00 2,340.00 Scope of Work: The contractor will need to refeed each switch, light and receptacle that is not working. Refeeding entails fishing wire through finished walls into existing boxes or new boxes depending on the circumstance, pulling circuits to the 2nd floor through existing walls, running wires back to the breaker panel and wiring them in. The power was lost in the wall somewhere, probably due to a remodel. There will likely be some plaster repair when finished. Materials will involve Romex wire to refeed the items which have lost power along with work boxes, breakers, devices, connectors, fasteners etc.