← 4183 E 146th St. Cleveland, OH 44128 · Portfolio index

Renovations & Updates - 4183 East 146th St, Cleveland, OH 44128.pdf

Generated 2026-07-01T06:53:26.288494+00:00 from live Dropbox Public folders.

Property4183 E 146th St. Cleveland, OH 44128
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Renovations & Updates - 4183 East 146th St, Cleveland, OH 44128.pdf
Source path/mnt/c/Users/digit/Dropbox/Real Estate/OH/4183 E 146th St. Cleveland, OH 44128/Public/08 - Repairs & Maintenance/Renovations & Updates - 4183 East 146th St, Cleveland, OH 44128.pdf
Modified UTC2022-06-03T03:35:20.0000000Z
Size bytes132736
Extraction methodmetadata-only+pdftotext-incremental

Description

4183 E 146th St, Cleveland, OH 44128 Renovations & Updates Exterior: - Rear and front steps repaired and painted - Installed storm door hardware rear - Installed new window panes on the second floor - Installed new hardware on two storm doors rear and side doors - Repaired a few missing shingles - Stained & painted all exterior wood, porches, steps, and rails - Installed new gutter downspout - Repaired asphalt and seal coated driveway Basement: - Painted the entire basement ceiling, walls, and f

Extracted Content

4183 E 146th St, Cleveland, OH 44128 Renovations & Updates Exterior: - Rear and front steps repaired and painted - Installed storm door hardware rear - Installed new window panes on the second floor - Installed new hardware on two storm doors rear and side doors - Repaired a few missing shingles - Stained & painted all exterior wood, porches, steps, and rails - Installed new gutter downspout - Repaired asphalt and seal coated driveway Basement: - Painted the entire basement ceiling, walls, and floor - Installed new handrail - New smoke alarms and carbon monoxide detectors in the basement - Furnace inspected by a licensed heating contractor (cleaned & checked) - Installed a new 40-gallon natural gas hot water tank with connectors - Installed new plumbing lines in the basement with a new water meter - The city installed a new water meter with all new sweat insulation around pipes. Interior: - Painted entire first-floor walls, ceiling, and trim - Installed new kitchen floor - Stain and polyurethane coat throughout first-floor living room and dining room - Installed new kitchen ceiling - Installed all new mini blinds - Refurbished kitchen cabinets and countertops - Some new plumbing ki