← 1315 E 114th St, Cleveland, OH 44106 · Portfolio index
Burst Pipe Repair Estimate (Patriot) - 1315 E 114th St, Cleveland, OH 44106.pdf
| Property | 1315 E 114th St, Cleveland, OH 44106 |
|---|---|
| Section | Repairs |
| Category | |
| Relative path | Repairs/Repairs During Sale/Burst Pipe Repair Estimate (Patriot) - 1315 E 114th St, Cleveland, OH 44106.pdf |
| Source path | /mnt/c/Users/digit/Dropbox/Real Estate/OH/1315 E 114th St, Cleveland, OH 44106/Public/Repairs/Repairs During Sale/Burst Pipe Repair Estimate (Patriot) - 1315 E 114th St, Cleveland, OH 44106.pdf |
| Modified UTC | 2025-01-20T19:15:21.0000000Z |
| Size bytes | 50838 |
| Extraction method | metadata-only+pdftotext-incremental |
Description
Estimates WO:TPPW8UDB Property Address : 1315 E 114th St Cleveland, OH 44106 Date submitted : 01/15/2025 Client Company: Home River Group Description Winterization and Pipe Burst Repairs, Drywall Repairs and Basement Restoration: Winterization and Pipe Burst Repairs De-ice / Defrost Supply Lines and Drains: Labor: $200 (approx. 2 hours at $100/hour) Materials: $95.00 (heat guns, insulating wraps) Pressure Test Supply and Drain Lines for Leaks: Labor: $150 (1.5 hours at $100/hour) Materials: $58.
Extracted Content
Estimates WO:TPPW8UDB Property Address : 1315 E 114th St Cleveland, OH 44106 Date submitted : 01/15/2025 Client Company: Home River Group Description Winterization and Pipe Burst Repairs, Drywall Repairs and Basement Restoration: Winterization and Pipe Burst Repairs De-ice / Defrost Supply Lines and Drains: Labor: $200 (approx. 2 hours at $100/hour) Materials: $95.00 (heat guns, insulating wraps) Pressure Test Supply and Drain Lines for Leaks: Labor: $150 (1.5 hours at $100/hour) Materials: $58.00 (pressure testing kit) Blow Out Lines (Leave Open and Allow to Drain): Labor: $150 (1.5 hours at $100/hour) Materials: $10 (air compressor usage) Apply Anti-Freeze to All Drains: Labor: $100 (1 hour at $100/hour) Materials: $150.00 (plumbing antifreeze, approx. 2 gallons) Thaw and Drain Hot Water Tank (Leave Open and Allow to Drain): Labor: $150 (1.5 hours at $100/hour) Materials: Included in labor (no additional materials) Repair Damaged Supply Lines (Copper or CPVC): Labor: $400 (4 hours at $100/hour) Materials: $250 (copper or CPVC pipes, fittings, solder, glue) Drywall Repairs Square Openings, Install Nailers, Patch Holes (Mud, Tape, Skim Coat), Sand, Prime, and Paint: Labor: $600 (6