10724 Gooding Avenue, Cleveland, OH 44108 Renovations & Updates Exterior: - New Shingles on the entire roof - Chimney tuckpointed around the base and midsections - Rear steps repaired - Installed steel exterior door - Installed two exterior storm doors - Installed rear hallway steel door which separates 1st and 2nd-floor units - Installed some new storm windows on the second floor - Installed three new windows on the third floor - Mason work completed on front red brick landscape wall near sidewalk - Installed new lighting fixture exterior - Installed new hardware on two storm doors Basement: - Painted entire basement walls and floor Interior: - First Floor - Painted the entire first floor - Installed new kitchen floor - Installed new bathroom floor - Installed toilet first floor - Installed new kitchen flooring - New wood staining of all wood floors - Reglaze bathtub - New mini…

File Contents

Read file contents
10724 Gooding Avenue, Cleveland, OH 44108
Renovations & Updates

Exterior:
- New Shingles on the entire roof
- Chimney tuckpointed around the base and midsections
- Rear steps repaired
- Installed steel exterior door
- Installed two exterior storm doors
- Installed rear hallway steel door which separates 1st and 2nd-floor units
- Installed some new storm windows on the second floor
- Installed three new windows on the third floor
- Mason work completed on front red brick landscape wall near sidewalk
- Installed new lighting fixture exterior
- Installed new hardware on two storm doors

Basement:
- Painted entire basement walls and floor
Interior:
- First Floor
- Painted the entire first floor
- Installed new kitchen floor
- Installed new bathroom floor
- Installed toilet first floor
- Installed new kitchen flooring
- New wood staining of all wood floors
- Reglaze bathtub
- New mini blinds
- Painted kitchen cabinets
- Some new plumbing kitchen & bathroom
- Some new lighting fixtures installed

-

Second Floor
- Painted the entire second floor
- Installed new kitchen floor
- Installed new bathroom floor
- Installed toilet 2nd floor
- New wood staining on all wood floors
- Reglaze bathtub
- New mini blinds on the 2nd floor
- Installed kitchen countertops
- Painted kitchen cabinets
- Some new plumbing kitchen & bathroom
- Some new lighting fixtures installed
- New storm door to porch balcony
- Install a re-conditioned natural gas furnace for the second floor by a professional
HVAC technician

-

Third Floor
- Painted the entire third floor, all hallways
- New mini blinds
- Some new lighting fixtures installed
- New handrail
- New carpet and padding on the third floor
- Installed three new windows