← 10724 Gooding Ave, Cleveland, OH 44108 · Portfolio index

Renovations & Updates - 10724 Gooding Ave, Cleveland, OH 44108.pdf

Generated 2026-07-01T06:53:26.288494+00:00 from live Dropbox Public folders.

Property10724 Gooding Ave, Cleveland, OH 44108
Section08 - Repairs & Maintenance
Categorypdf
Relative path08 - Repairs & Maintenance/Renovations & Updates - 10724 Gooding Ave, Cleveland, OH 44108.pdf
Source path/mnt/c/Users/digit/Dropbox/Real Estate/OH/10724 Gooding Ave, Cleveland, OH 44108/Public/08 - Repairs & Maintenance/Renovations & Updates - 10724 Gooding Ave, Cleveland, OH 44108.pdf
Modified UTC2022-04-11T17:24:03.0000000Z
Size bytes132548
Extraction methodmetadata-only+pdftotext-incremental

Description

10724 Gooding Avenue, Cleveland, OH 44108 Renovations & Updates Exterior: - New Shingles on the entire roof - Chimney tuckpointed around the base and midsections - Rear steps repaired - Installed steel exterior door - Installed two exterior storm doors - Installed rear hallway steel door which separates 1st and 2nd-floor units - Installed some new storm windows on the second floor - Installed three new windows on the third floor - Mason work completed on front red brick landscape wall near sidew

Extracted Content

10724 Gooding Avenue, Cleveland, OH 44108 Renovations & Updates Exterior: - New Shingles on the entire roof - Chimney tuckpointed around the base and midsections - Rear steps repaired - Installed steel exterior door - Installed two exterior storm doors - Installed rear hallway steel door which separates 1st and 2nd-floor units - Installed some new storm windows on the second floor - Installed three new windows on the third floor - Mason work completed on front red brick landscape wall near sidewalk - Installed new lighting fixture exterior - Installed new hardware on two storm doors Basement: - Painted entire basement walls and floor Interior: - First Floor - Painted the entire first floor - Installed new kitchen floor - Installed new bathroom floor - Installed toilet first floor - Installed new kitchen flooring - New wood staining of all wood floors - Reglaze bathtub - New mini blinds - Painted kitchen cabinets - Some new plumbing kitchen & bathroom - Some new lighting fixtures installed - Second Floor - Painted the entire second floor - Installed new kitchen floor - Installed new bathroom floor - Installed toilet 2nd floor - New wood staining on all wood floors - Reglaze bathtub