sheet1: Draw · Date · Milestone/Scope · Estimated Labor + Materials · Notes · Draw 1 · April 12 · Deck/Egress Framing Materials + Mobilization · 6000 · Purchase framing lumber, fasteners, lag bolts, prep demolition and layout · Draw 2 · April 17 · Deck/Egress Completion (code-ready) · 5500 · Finalize framing, railing install, compliance check for egress requirements · Draw 3 · April 22 · 84.1 Flooring + Paint Prep · 4000 · Paint supplies, taping, sanding, flooring delivery (install post-inspection) · Draw 4 · April 28 · 84.1 Finish Work (Flooring, Fixtures) · 3000 · Install vanity accessories, doors, floor transitions, patch & trim work · Draw 5 · May 3 · Staging, CAM Setup, Final Punch List · 3500 · Jasmine’s final labor, CAM/linen startup, cleaning, staging, key setup

File Contents

Read file contents
sheet1: Draw # | Date | Milestone/Scope | Estimated Labor + Materials | Notes | Draw 1 | April 12 | Deck/Egress Framing Materials + Mobilization | 6000 | Purchase framing lumber, fasteners, lag bolts, prep demolition and layout | Draw 2 | April 17 | Deck/Egress Completion (code-ready) | 5500 | Finalize framing, railing install, compliance check for egress requirements | Draw 3 | April 22 | 84.1 Flooring + Paint Prep | 4000 | Paint supplies, taping, sanding, flooring delivery (install post-inspection) | Draw 4 | April 28 | 84.1 Finish Work (Flooring, Fixtures) | 3000 | Install vanity accessories, doors, floor transitions, patch & trim work | Draw 5 | May 3 | Staging, CAM Setup, Final Punch List | 3500 | Jasmine’s final labor, CAM/linen startup, cleaning, staging, key setup